2.2.2	Procedures	
2.3		MATERIAL CONTROL SECTION	
2.3.1	Objectives	
2.3.2	Procedures	
2.4      	MAINTENANCE &COATING PLANT	
2.4.1	Objectives	
2.4.2	Procedures	
2.5	PIPELINE CONSTRUCTION SECTION	
2.5.1	Right of Way Clearing/Grading	
2.5.1.3	HSE Precautions	
2.5.2	Stringing	
2.5.2.3	HSE Precautions	
2.5.3	Welding	
2.5.3.3	HSE Precautions	
2.5.4	Trenching / Back-filling	
2.5.4.3	HSE Precautions	
2.5.5	Girth Weld Sleeving and Lowering-in              		98
2.5.5.3	HSE Precautions	100
2.5.6	Tie-ins, Field Bending and Crossings 	102
2.5.6.3	HSE Precautions							104
2.5.7	Fabrication							106
2.5.7.3	HSE Precautions							107
2.5.8	Hydrostatic Testing							108
2.5.8.3	HSE Precautions	
2.5.9	Cathodic Protection						11
2.5.10	Commissioning	
2.5.11	Civil Work	112
2.5.11.3	HSE Precautions			113
2.5.12	As-Built Drawings							114
2.5.13	Completion Report							114
	
ANNEXES	          115

 
















1.0.0.0	        GENERAL 
                 
 
1.1	SCOPE				                                   

I	
This document will be known as the Pipeline Construction Manual of Projects Department of Sui Northern Gas Pipelines Limited (subsequently referred to as SNGPL or the Company).

II	
It defines the objectives of Projects Department and lays down the procedures to achieve the objectives.

III	
It also defines the duties and responsibilities of Projects personnel and the channels of control.

IV	
Any alteration / modification of this document would be possible only with the specific approval of the Management.