  1. 2.2.2 Procedures
  2. 2.3 MATERIAL CONTROL SECTION
  3. 2.3.1 Objectives
  4. 2.3.2 Procedures
  5. 2.4 MAINTENANCE &COATING PLANT
  6. 2.4.1 Objectives
  7. 2.4.2 Procedures
  8. 2.5 PIPELINE CONSTRUCTION SECTION
  9. 2.5.1 Right of Way Clearing/Grading
  10. 2.5.1.3 HSE Precautions
  11. 2.5.2 Stringing
  12. 2.5.2.3 HSE Precautions
  13. 2.5.3 Welding
  14. 2.5.3.3 HSE Precautions
  15. 2.5.4 Trenching / Back-filling
  16. 2.5.4.3 HSE Precautions
  17. 2.5.5 Girth Weld Sleeving and Lowering-in 98
  18. 2.5.5.3 HSE Precautions 100
  19. 2.5.6 Tie-ins, Field Bending and Crossings 102
  20. 2.5.6.3 HSE Precautions 104
  21. 2.5.7 Fabrication 106
  22. 2.5.7.3 HSE Precautions 107
  23. 2.5.8 Hydrostatic Testing 108
  24. 2.5.8.3 HSE Precautions
  25. 2.5.9 Cathodic Protection 11
  26. 2.5.10 Commissioning
  27. 2.5.11 Civil Work 112
  28. 2.5.11.3 HSE Precautions 113
  29. 2.5.12 As-Built Drawings 114
  30. 2.5.13 Completion Report 114
  31. ANNEXES 115
  32. 1.0.0.0 GENERAL
  33. 1.1 SCOPE
  34. I
  35. This document will be known as the Pipeline Construction Manual of Projects Department of Sui Northern Gas Pipelines Limited (subsequently referred to as SNGPL or the Company).
  36. II
  37. It defines the objectives of Projects Department and lays down the procedures to achieve the objectives.
  38. III
  39. It also defines the duties and responsibilities of Projects personnel and the channels of control.
  40. IV
  41. Any alteration / modification of this document would be possible only with the specific approval of the Management.